Engine Rebuild

1985 RZ350

1985 California RZ350

Before putting the casings together make sure you have all the nuts, washers, bolts and a tube of Yamabond or a similar liquid gasket sealeant.


Before fitting the casings together do a final check of all the parts and pieces, and that everything is rotating well. Run a line of Yamabond gasket cement or an equivalent around the mating surfaces.


There are two locating dowels which must be fitted at the front and rear of the casing. The front one is forward of the two central crank bearings. The rear is on the left rear of the casing.


Next Section -->